Modular design offers programme savings, improves safety and reduces risk.
Key considerations are installation tolerances between modules; interfaces to be finished on site and fire barrier coordination.
A2O can accurately design and specify all the above for modular construction.
All the modules for Sir Frederick Gibberd College were manufactured off-site. A2O’s design also allows for the impact on insulation and finishes.
Our supply chain partner for modular construction is Caledonian Modular, an industry leader in Modern Methods of Construction (MMC).
MMC builds on recommendations for construction efficiency and production of components from the Egan Report, Rethinking Construction.
Registered in England 4344380