Challenges
The space around the building was extremely limited. There was insufficient storage space for the cladding panels.
Each subcontract had to be fully completed before the next commenced, giving a very tight and rigid programme.
Throughout the construction process the athletics track was in use by the public.
Solutions
A2O coordinated carefully with the Main Contractor to get panels delivered and stored within the steel frame, checking every detail e.g. one lorry was only an inch within the frame soffit.
A2O diligently coordinated all procurement and installation to hit all the tight programme dates.
A2O coordinated the work for completion before a subsequent new athletics track was installed.
Fact File
Sector
- Leisure
STATUS
- New Build
Value
- £800,000
Scope of Work
- Corium Brick Slips
-
European Redwood with
MicroShades® Brunnea treatment - Limestone Aerolite Rainscreen
- Rockpanel on Eurobond Rainspan
- Alumiunium Fascias