Reclad

A2O carries out safety analysis on existing installations and provides replacement cladding, certified to passive fire prevention standards.
  • C1169 Pi Bristol Elevation - C1169 Pi Bristol Elevation
  • Services Reclad Carousel 4 - Services Reclad Carousel 4
Since the tragic event at Grenfell Tower in June 2017 there has been a great deal of work carried out to identify buildings that are clad with unsafe products. A2O have been involved in building BS8414 test rigs at the BRE to determine whether a current build-up is appropriate and whether an intended installation will pass. Services that we have carried out on reclad schemes include:
  • Intrusive surveys including reports on current installations
  • 3D scans of existing elevations
  • Design services for replacement cladding
  • Arranging scaffolding and access equipment
  • Site management
  • Removal and disposal of existing installation
  • Installation of new A1 and A2 fire-rated cladding systems
  • Installation of new fire barriers to LPS 1531 standards (see below)
A2O are a LPCB certified installer of passive fire protection under LPS 1531, accredited and regularly audited by the BRE, see more. In addition to the completed Case Studies below, we are currently recladding several London residential and hotel buildings.

Related Case Studies